muhammaddavin11

Management Trainee
April 19, 2002

About Candidate

I am a graduate of a D-4 in Civil Infrastructure Engineering and Architectural Design at University of Diponegoro. I have internship experience as Quality Control Staff at PT Cipta Prima Sejahtera and responsible for monitoring capping beam, excavation, struting, dewatering, and waller beam works. Mastering skill competencies and enthusiastic to be able to work as General Affair, Marketing Staff, and Quality Control Staff. My ability to maintain high work standards and adapt quickly, makes me ready to face challenges in a dynamic environment.

Education

D
D-4 in Civil Infrastructure Engineering and Architectural Design 2020-2024
Diponegoro University

I am a graduate of a D-4 in Civil Infrastructure Engineering and Architectural Design at University of Diponegoro. I have internship experience as Quality Control Staff at PT Cipta Prima Sejahtera and responsible for monitoring capping beam, excavation, struting, dewatering, and waller beam works. Mastering skill competencies and enthusiastic to be able to work as General Affair, Marketing Staff, and Quality Control Staff. My ability to maintain high work standards and adapt quickly, makes me ready to face challenges in a dynamic environment.

Work & Experience

S
Staff Internship October 2023 - December 2023
PT. Cipta Prima Sejahtera

• Monitored drilling and casting of 15 secant piles on a daily basis, ensuring each step of the process complied with SNI standards and project technical specifications. • Supervised coden tests for material quality testing on 20 concrete samples, recording test results with an accuracy rate of up to 99%. • Ensured bore pile drilling and casting work at 10 points with a depth of 25 meters was completed on schedule within 2 weeks. • Conducted 5 monitoring of capping beam, excavation, struting, dewatering, and waller beam works, ensuring all construction processes were on schedule and technical specifications. • Performed a checklist of work on 50 coupling units, 30 end plates, and 40 stiffeners on struts with a total length of 200 meters, ensuring the feasibility of installation to support the stability of the project structure. • Performed a checklist of grouting work at 25 base plate points, ensuring the quality of the connection between the base plate and secant pile according to technical standards and structural strength

S
Staff Internship July 2023 - September 2023
PT. Mitralanggeng Jaya Konstruksi

• Performed daily monitoring of staircase works which included more than 50 units of stairs, ensuring the use of concrete materials according to specifications. • Supervised 3 finishing works in mall areas such as restrooms, shop fronts, and islands, by recording daily progress and ensuring quality according to predetermined standards. • Ensured the progress of finishing 150 meters of ramp was completed within 3 weeks, with daily documentation that included details of material usage. • Mapped a 5000 m² area to document work progress and support decision-making. • Marked tenant walls, island areas, and gutter with a high level of precision, using measuring tools such as theodolite to ensure conformity with working drawings. • Mapped and ensured the installation of 250 kansteen units over a 300 m² area according to the technical design.